The objective of your oil sands pilot plant program should be to examine ways to improve recovery, process efficiency, process costs, product quality and product handling characteristics or to establish confidence for financers, shareholders, managers or other key stakeholders in the project.
The cornerstones of SGS oil sands pilot plant projects include:
SGS takes a team approach to pilot plant testing. Our projects typically include experts in project and technology management, health and safety, data handling and finance. It also can include your engineers, contractors and corporate staff.
Early in the planning stages of your project, we discuss your project timing, anticipated project scope and financial requirements. This allows us to develop the pilot program that best suits your needs within your budgetary constraints. Discussion and consultation continue throughout start-up, commissioning and operation.
SGS creates a detailed flowsheet, material balance and a pilot plant support requirements plan. SGS normally engages in a project Hazards and Operability Analysis (HAZOP) for the project, and creates Standard Operating Procedures (SOP) to ensure safety for all those involved. We also take important steps to minimize human and environmental risks in your project.
SGS technical experts provide technical support throughout the lifecycle of your pilot plant, including:
The recording of pilot plant analytical data must be consistent and accurate throughout the life of your project. SGS is a global technical leader and has decades of experience producing accurate, repeatable laboratory analysis for clients worldwide. We will produce detailed templates for your plant activities and measurements prior to project initiation.
At the completion of your pilot plant operation, we complete and report all relevant data quickly and accurately, allowing you to make informed operational decisions. Our goal is to present you with a completed final report within 12 weeks of a piloting campaign finish.
Partner with SGS, and let the world’s leading inspection, verification, testing, and certification company successfully operate and manage your oil sands pilot project.
Pilot plant testing and development in the USA
The service in which you are interested is not currently available in the USA. However our Lakefield facility in Canada can meet your metallurgical and process design requirements. We provide the bankable experience, technical excellence and state-of-the-art equipment you need to reduce your technical risk before you make the major investments needed to develop mining sites.
SGS in Canada has provided scoping studies, flowsheet development and extensive piloting capabilities to the industry for over 70 years in a wide range of commodities, from gold to copper to uranium to REE to high tech metals and coal. Contact us to find out more.